Our House Blog

January 24, 2008

Excavation

Filed under: Articles — admin @ 8:32 pm

Adam Mazur and his brother Dick are great people.  They are easy to talk with.  They listen to what we say and make suggestions to help us choose the best use the land.  They incorporate some of our ideas into the work they need to do.  Today they are working to make a gentle path to the back of our property.  We told them about our grandchildren and how we plan to make walking paths.  We mentioned that a few weeks ago, but they didn’t forget.  Today they started making an access to the path.  That is for the summer time.  Adam and Steve are also talking about a sledding path for the kids to enjoy.  The possibilities are endless.  Click on the picture below to see more photos.

tn_img_8207.JPG

Foundation Complete

Filed under: Articles — admin @ 8:06 pm

Yesterday was a big day for John Fiery and his team.  They completed the foundation decking.  The next step will be to add the first story to the house.  Click on the picture for more photos.

tn_img_8204.JPG

January 23, 2008

Progress as of 1-22-08

Filed under: Articles — admin @ 10:14 pm

John Fiery and the team are making progress every day.  It is exciting to see how the house is being built.  The Manzur brothers are doing an outstanding job of grading the land while working in concert with John Fiery and his team.  Click on the picture to see more photos.

tn_img_8129.JPG

January 16, 2008

The Foundation

Filed under: Articles — admin @ 8:39 pm

The Logix blocks are all in place.  The walls are reinforced.  The rebar is set into the Logix blocks.  Now it is time for the concrete to be placed in the Insulated Concrete Forms.  Today we met the Logix distributor, Kent Ruesswick whose website is www.nhicf.net.  We talked about the Logix blocks.  They are made of Expanded Polystyrene (EPS), the same material used to make insulated coffee cups.  After the concrete is placed in the blocks, the foundation will have an factor of R24.  Kent says the colder it is outside, the better the product preforms.

Today the concrete was pumped into the Logix block foundation.

tn_img_8073.JPG

Click the picture to see more photos…

The well

Filed under: Articles — admin @ 8:19 pm

A well is necessary when living in the country. Yesterday we watched the well being drilled. From our vantage point - we have to stay out of the way - there was not a lot of action to see. It is sort of like watching paint dry. The well came in at 560 feet down.

Violette found the well site.

January 13, 2008

Site Supervisor at work

Filed under: Articles, Builder John Fiery — admin @ 12:42 am

John Fiery is the site supervisor for this project being managed by BuildingAlternatives.Com

John Fiery Construction

Major progress on the Foundation and Drainage System

Filed under: Articles — admin @ 12:36 am

We still have a ways to go - but progess is steady.

Within a week or two we hope to have the foundation fully in place.

ICF Block Placement has started!

Preparing the Foundation and Drainage System

Filed under: Articles — admin @ 12:32 am

At this step, the Mazur Brothers have prepared the foundation and drainage system bed. Lots of work remains before the foundation is fully completed.

Foundation and Drainage System Photos

January 5, 2008

More progress! The frost wall has been placed!

Filed under: Articles — admin @ 5:18 pm

Our builders have finished placing the frost wall. The concrete has been poured (placed) into the ICF blocks by Cullen Concrete Form Company.

Our well company, Contookcock Artesian Well Company, has been here to see where to dig for a well.

Next step is to finish the foundation and slab before our SIP (Structured Insulated Panels) are installed. These panels form the walls and the roof of our home.

.ICF Frost wall has been placed